We have recently been told that the repairs to the bridge at Tree Corner will take an extra two weeks to complete. Apparently the flow of water down the stream has been greater than was expected, and so everything has taken a little longer. The work is now scheduled to be finished by the 20th December, and the road should be open by the Christmas break.